Technical Design Phase

The final design is ready and the permit has been applied for and is subject to assessment by the municipality. At this point, the drawings can already be upgraded to the level of a technical design. But you can of course also wait until the environmental permit has been granted and then start with the technical elaboration of the design. During this phase, all data necessary for the construction preparations are recorded and the design is expanded with additional details and, for example, frame drawings necessary for tendering and implementation. The technical design will be further supplemented with a clear technical description (also called specifications) or an extensive list of materials and colors. The documents together will be used as contract documents for the tender during the next phase. During the implementation phase, the implementation drawings will be the benchmark for checking any additional and less work.